E-93026 Analysis
GEn01 Analysis
for current analysis issues
from analysis meetings September 2001 - March 2002
Run Lists
Q2=0.5 ND3 runlist:
derived from logbook entries
Q2=0.5 firstpass list:
List of ND3 runs used for firstpass analysis
Q2=1 online runlist:
maintained by shift crew during experiment. Contains runs for all
targets. Some errors corrected since.
Report and beam polarization values for for all ND3 production
runs.
Notes on electronics dead-time.
Accuracy of charge measurement and charge asymmetry
correction are evaluated.
Beam current structure during a helicity period is looked at.
Contamination of neutron detection by multi-step processes as
d(e,e'p) followed by (p,n), e.g. in the lead shielding of the
neutron detector, is estimated.
Marko Zeier   Markus.Zeier@unibas.ch